PILE DYNAMIC LOAD TEST (PDA)
Pile & Foundation
Dynamic Load Test (PDA)
Pile Integrity Test (PIT)
Sonic Logging Test (SLT)
Pile Maintain Load Test (MLT)
Soil Testing
Soil Investigation (SI)
Mackintosh Probe Test (MPT)
Field Density Test (FDT)
Standard Proctor (SP)
Cone Penetration Test (CPT)
California Bearing Ratio (CBR)
Plate Bearing Test (PBT)
Civil Material Laboratory
Compressive Strength Test
(CST)
Rebound Hammer Test
Windsor Probe Test
Ultrasonic Pulse Velocity (UPV)
Steel Bar Tensile Test
Aggregate
Bitumen
Geotechnical Laboratory
Laboratory Test
Instrumentation & Monitoring
Vibration Monitoring (VM)
Vibrating Wire Piezometer
Pneumatic Piezometer
Standpipe Piezometer
Inclinometer
Magnetic Extensionmeter
Tilt Meter
Settlement Plate
Water & Air Monitoring
Effluent & Waste Monitoring
Noise
Monitoring
Monitoring for EIA
Occupational Safety and Health Monitoring
PILE DYNAMIC LOAD TEST (PDA)
Foundtest (M) Sdn. Bhd. is specialized in providing high strain dynamic load testing, analysis and consulting services for the piling work industry. Dynamic pile testing (commonly known as PDA test) is performed by well-trained and experience engineers using a Pile Driving Analyzer (PDA) on site and pile wave analysis will be carried out on the signal acquired by using Case Pile Wave Analysis Program (CAPWAP).
Dynamic pile testing technology had been introduced to the industry for more than 30 years. This time and cost saving method of pile testing has eventually getting popular and is widely recognized nowadays. The American Society of Testing and Materials has developed a standard (ASTM:D4945) for the performance of dynamic load test. It is a very cost-efficient tool used to replace the time consuming conventional static load test in determination of pile capacity.
PDA is a very powerful tool in monitoring the response of a pile subjected to hammer impact applied at the pile head. The response is measured in terms of force and acceleration close to the pile head. Other than determination of pile capacity, the behaviour during the pile installation works, such as the pile integrity, driving stresses and the energy transmitted to the pile. Once the pile wave analysis is completed, the full report will present the predicted static load-settlement behaviour and the pile capacity distribution among the pile shaft and pile toe. All these information are very useful in assessment of the pile capabilities by the engineers.

Foundtest
Drop Hammer System for PDA Test
For more information, quotation or site appointment, please call us or drop us a message here .